ChargeCensus

AMLI Ridgegate

Available

EV charging station in Lone Tree, Colorado on the Loop network — 40 Level 2. US DOE AFDC station 453155.

At a glance

AMLI Ridgegate is a public EV charging station at 10020 Trainstation Cir in Lone Tree, Colorado, on the Loop network. It has 40 charging ports (40 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 28, 2026.

Total ports
40
DC fast
0
Level 2
40
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID453155
NetworkLoop
StatusAvailable (E)
AccessPublic
FacilityOther
Open dateJan 28, 2026
Last updated at sourceSep 22, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Loop

Operates 1,233 stations in the DOE registry — view the full network →

Location

Address
10020 Trainstation Cir
ZIP
80124
Coordinates
39.53526, -104.87204

Within ~15 km

Nearby charging

What kind of charging does AMLI Ridgegate offer?

Of its 40 ports, 40 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 14.1 times the Colorado average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.

How does AMLI Ridgegate compare with other stations in Lone Tree?

Lone Tree has 28 charging stations in the DOE registry with 121 ports. AMLI Ridgegate accounts for 33% of the charging ports in Lone Tree. Loop runs 3 stations in Lone Tree. Statewide, Colorado has 3,163 stations and 8,973 ports, the 7th-largest station count of the 51 states and DC. The biggest station in Colorado, NREL Employee Parking Garage in Golden, has 108 ports.

Who operates AMLI Ridgegate?

Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 38 of those stations are in Colorado, 1% of the state's 3,163.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 28, 2026, one of 432 stations in Colorado with a 2026 open date. The station's record was last updated at the source on Sep 22, 2026.

Frequently asked questions

How many chargers does AMLI Ridgegate have?

AMLI Ridgegate has 40 charging ports: 40 Level 2.

Does AMLI Ridgegate have DC fast charging?

No. The registry lists no DC fast ports here; its 40 ports are all Level 2.

What connectors does AMLI Ridgegate have?

AMLI Ridgegate has J1772 connectors.

Is AMLI Ridgegate open to the public?

Yes. AMLI Ridgegate is listed with public access, and its status is available.

Where is AMLI Ridgegate?

AMLI Ridgegate is at 10020 Trainstation Cir, Lone Tree, CO 80124. Its coordinates are 39.53526, -104.87204.

More EV charging around Lone Tree

Working with Colorado charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 453155, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “AMLI Ridgegate, Lone Tree, CO (AFDC station 453155)”, https://chargecensus.com/stations/colorado/amli-ridgegate-453155 (data as of October 12, 2026).