The Enclave Station 2707
AvailableEV charging station in Torrance, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 261008.
At a glance
The Enclave Station 2707 is a public EV charging station at 980 W 190th St in Torrance, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 18, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 261008 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 18, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 980 W 190th St
- City
- Torrance
- State
- California
- ZIP
- 90502
- Coordinates
- 33.85744, -118.29434
Within ~15 km
Nearby charging
- Artesia Apartments70 ports
Loop · Available
- LA County DHS MLK Lot A70 ports
PowerFlex · Available
- Harmony Gates59 ports
Loop · Available
- Westin Los Angeles Airport50 ports
Autel · Available
bp pulse · Available
- Airport Center40 ports
AmpUp · Available
What kind of charging does The Enclave Station 2707 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Enclave Station 2707 compare with other stations in Torrance?
Torrance has 175 charging stations in the DOE registry with 524 ports, the 19th-most of 812 cities and towns in California. The Enclave Station 2707 accounts for under 1% of the charging ports in Torrance. ChargePoint runs 125 stations in Torrance. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates The Enclave Station 2707?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 18, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Enclave Station 2707 have?
The Enclave Station 2707 has 2 charging ports: 2 Level 2.
Does The Enclave Station 2707 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does The Enclave Station 2707 have?
The Enclave Station 2707 has J1772 connectors.
Is The Enclave Station 2707 open to the public?
Yes. The Enclave Station 2707 is listed with public access, and its status is available.
Where is The Enclave Station 2707?
The Enclave Station 2707 is at 980 W 190th St, Torrance, CA 90502. Its coordinates are 33.85744, -118.29434.
More EV charging around Torrance
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 261008, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Enclave Station 2707, Torrance, CA (AFDC station 261008)”, https://chargecensus.com/stations/california/the-enclave-station-2707-261008 (data as of October 12, 2026).