ChargeCensus

Pw Yard Nb Library

Available

EV charging station in Redondo Beach, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 217358.

At a glance

Pw Yard Nb Library is a public EV charging station at 2000 Artesia Blvd in Redondo Beach, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 12, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID217358
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 12, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2000 Artesia Blvd
ZIP
90278
Coordinates
33.87253, -118.37665

Within ~15 km

Nearby charging

What kind of charging does Pw Yard Nb Library offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Pw Yard Nb Library compare with other stations in Redondo Beach?

Redondo Beach has 14 charging stations in the DOE registry with 38 ports. Pw Yard Nb Library accounts for 5% of the charging ports in Redondo Beach. ChargePoint runs 9 stations in Redondo Beach. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Pw Yard Nb Library?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 12, 2022, one of 2,281 stations in California with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Pw Yard Nb Library have?

Pw Yard Nb Library has 2 charging ports: 2 Level 2.

Does Pw Yard Nb Library have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Pw Yard Nb Library have?

Pw Yard Nb Library has J1772 connectors.

Is Pw Yard Nb Library open to the public?

Yes. Pw Yard Nb Library is listed with public access, and its status is available.

Where is Pw Yard Nb Library?

Pw Yard Nb Library is at 2000 Artesia Blvd, Redondo Beach, CA 90278. Its coordinates are 33.87253, -118.37665.

More EV charging around Redondo Beach

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 217358, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Pw Yard Nb Library, Redondo Beach, CA (AFDC station 217358)”, https://chargecensus.com/stations/california/pw-yard-nb-library-217358 (data as of October 12, 2026).