ChargeCensus

Ports America - San Pedro

Temporarily unavailable

EV charging station in San Pedro, California on the EV Range network — 3 DC fast. US DOE AFDC station 416300.

At a glance

Ports America - San Pedro is a public EV charging station at 2001 John S Gibson Blvd, in San Pedro, California, on the EV Range network. It has 3 charging ports (3 DC fast) with CCS connectors. The US DOE registry lists it as temporarily unavailable, open since Jul 16, 2025.

Total ports
3
DC fast
3
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID416300
NetworkEV Range
StatusTemporarily unavailable (T)
AccessPublic
FacilityPublic site
Open dateJul 16, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EV Range

Operates 81 stations in the DOE registry — view the full network →

Location

Address
2001 John S Gibson Blvd,
ZIP
90731
Coordinates
33.76600, -118.27928

Within ~15 km

Nearby charging

What kind of charging does Ports America - San Pedro offer?

Of its 3 ports, 3 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 20% below the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.

How does Ports America - San Pedro compare with other stations in San Pedro?

San Pedro has 13 charging stations in the DOE registry with 32 ports. Ports America - San Pedro accounts for 9% of the charging ports in San Pedro. EV Range runs 2 stations in San Pedro. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Ports America - San Pedro?

EV Range operates 81 stations in the registry across 15 states, with 161 DC fast and 237 Level 2 ports in total. 59 of those stations are in California, under 1% of the state's 21,814.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 16, 2025, one of 2,781 stations in California with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ports America - San Pedro have?

Ports America - San Pedro has 3 charging ports: 3 DC fast.

Does Ports America - San Pedro have DC fast charging?

Yes. The registry lists 3 DC fast ports at Ports America - San Pedro, with CCS connectors.

What connectors does Ports America - San Pedro have?

Ports America - San Pedro has CCS connectors.

Is Ports America - San Pedro open to the public?

Yes. Ports America - San Pedro is listed with public access, and its status is temporarily unavailable.

Where is Ports America - San Pedro?

Ports America - San Pedro is at 2001 John S Gibson Blvd,, San Pedro, CA 90731. Its coordinates are 33.76600, -118.27928.

More EV charging around San Pedro

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 416300, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ports America - San Pedro, San Pedro, CA (AFDC station 416300)”, https://chargecensus.com/stations/california/ports-america-san-pedro-416300 (data as of October 12, 2026).