Mendo College Fortbragg Ev1
AvailableEV charging station in Fort Bragg, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 197607.
At a glance
Mendo College Fortbragg Ev1 is a public EV charging station at 1211 Del Mar Dr in Fort Bragg, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 12, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 197607 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 12, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1211 Del Mar Dr
- City
- Fort Bragg
- State
- California
- ZIP
- 95437
- Coordinates
- 39.42172, -123.81067
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Destination · Available
- MacCallum House Suites4 ports
Non-networked · Available
- Ch - Pda4 ports
ChargePoint · Available
Tesla Destination · Available
- SCP Mendocino Inn and Farm3 ports
Non-networked · Available
What kind of charging does Mendo College Fortbragg Ev1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Mendo College Fortbragg Ev1 compare with other stations in Fort Bragg?
Fort Bragg has 11 charging stations in the DOE registry with 33 ports. Mendo College Fortbragg Ev1 accounts for 6% of the charging ports in Fort Bragg. ChargePoint runs 6 stations in Fort Bragg. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Mendo College Fortbragg Ev1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 12, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Mendo College Fortbragg Ev1 have?
Mendo College Fortbragg Ev1 has 2 charging ports: 2 Level 2.
Does Mendo College Fortbragg Ev1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Mendo College Fortbragg Ev1 have?
Mendo College Fortbragg Ev1 has J1772 connectors.
Is Mendo College Fortbragg Ev1 open to the public?
Yes. Mendo College Fortbragg Ev1 is listed with public access, and its status is available.
Where is Mendo College Fortbragg Ev1?
Mendo College Fortbragg Ev1 is at 1211 Del Mar Dr, Fort Bragg, CA 95437. Its coordinates are 39.42172, -123.81067.
More EV charging around Fort Bragg
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 197607, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Mendo College Fortbragg Ev1, Fort Bragg, CA (AFDC station 197607)”, https://chargecensus.com/stations/california/mendo-college-fortbragg-ev1-197607 (data as of October 12, 2026).