ChargeCensus

MacCallum House Suites

Available

EV charging station in Mendocino, California, not on a charging network — 4 Level 2. US DOE AFDC station 117100.

At a glance

MacCallum House Suites is a public EV charging station at 10691 Palette Dr in Mendocino, California, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Jan 1, 2019.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID117100
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityInn
Open dateJan 1, 2019
Last updated at sourceJul 15, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
10691 Palette Dr
City
Mendocino
ZIP
95460
Coordinates
39.30936, -123.79806

Within ~15 km

Nearby charging

What kind of charging does MacCallum House Suites offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is roughly in line with the California average of 3.7 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NACS (Tesla), the North American Charging Standard connector. Pricing as reported to the registry: “Free”. The site is listed as a inn location.

How does MacCallum House Suites compare with other stations in Mendocino?

Mendocino has 5 charging stations in the DOE registry with 19 ports. MacCallum House Suites accounts for 21% of the charging ports in Mendocino. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates MacCallum House Suites?

MacCallum House Suites is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 1, 2019, one of 423 stations in California with a 2019 open date. The station's record was last updated at the source on Jul 15, 2026.

Frequently asked questions

How many chargers does MacCallum House Suites have?

MacCallum House Suites has 4 charging ports: 4 Level 2.

Does MacCallum House Suites have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does MacCallum House Suites have?

MacCallum House Suites has J1772 and NACS (Tesla) connectors.

Is charging at MacCallum House Suites free?

Pricing as reported to the DOE registry: Free.

Is MacCallum House Suites open to the public?

Yes. MacCallum House Suites is listed with public access, and its status is available.

Where is MacCallum House Suites?

MacCallum House Suites is at 10691 Palette Dr, Mendocino, CA 95460. Its coordinates are 39.30936, -123.79806.

More EV charging around Mendocino

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 117100, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “MacCallum House Suites, Mendocino, CA (AFDC station 117100)”, https://chargecensus.com/stations/california/maccallum-house-suites-117100 (data as of October 12, 2026).