Long Beach Lb Must 2
AvailableEV charging station in Long Beach, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 465987.
At a glance
Long Beach Lb Must 2 is a public EV charging station at 901 De Forest Avenue in Long Beach, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 12, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 465987 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 12, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 901 De Forest Avenue
- City
- Long Beach
- State
- California
- ZIP
- 90806
- Coordinates
- 33.77725, -118.20421
Within ~15 km
Nearby charging
- Artesia Apartments70 ports
Loop · Available
- LA County DHS MLK Lot A70 ports
PowerFlex · Available
- Harmony Gates59 ports
Loop · Available
- LA County Probation HQ41 ports
PowerFlex · Available
- LA County DHS MLK Lot C37 ports
PowerFlex · Available
Tesla Supercharger · Available
What kind of charging does Long Beach Lb Must 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Long Beach Lb Must 2 compare with other stations in Long Beach?
Long Beach has 229 charging stations in the DOE registry with 679 ports, the 14th-most of 812 cities and towns in California. Long Beach Lb Must 2 accounts for under 1% of the charging ports in Long Beach. ChargePoint runs 186 stations in Long Beach. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Long Beach Lb Must 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 12, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Long Beach Lb Must 2 have?
Long Beach Lb Must 2 has 2 charging ports: 2 Level 2.
Does Long Beach Lb Must 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Long Beach Lb Must 2 have?
Long Beach Lb Must 2 has J1772 connectors.
Is Long Beach Lb Must 2 open to the public?
Yes. Long Beach Lb Must 2 is listed with public access, and its status is available.
Where is Long Beach Lb Must 2?
Long Beach Lb Must 2 is at 901 De Forest Avenue, Long Beach, CA 90806. Its coordinates are 33.77725, -118.20421.
More EV charging around Long Beach
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 465987, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Long Beach Lb Must 2, Long Beach, CA (AFDC station 465987)”, https://chargecensus.com/stations/california/long-beach-lb-must-2-465987 (data as of October 12, 2026).