ChargeCensus

Granite Bay Main Beach Parking Lot

Available

EV charging station in Granite Bay, California, not on a charging network — 2 Level 2. US DOE AFDC station 218633.

At a glance

Granite Bay Main Beach Parking Lot is a public EV charging station at 500 Folsom Dam Road in Granite Bay, California, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 18, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID218633
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateMay 18, 2022
Last updated at sourceSep 14, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
500 Folsom Dam Road
City
Granite Bay
ZIP
95746
Coordinates
38.75562, -121.14874

Within ~15 km

Nearby charging

What kind of charging does Granite Bay Main Beach Parking Lot offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.

How does Granite Bay Main Beach Parking Lot compare with other stations in Granite Bay?

Granite Bay has 6 charging stations in the DOE registry with 16 ports. Granite Bay Main Beach Parking Lot accounts for 13% of the charging ports in Granite Bay. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates Granite Bay Main Beach Parking Lot?

Granite Bay Main Beach Parking Lot is listed as non-networked: its chargers are not run through a charging-network account. California has 1,389 non-networked stations, 6% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 18, 2022, one of 2,281 stations in California with a 2022 open date. The station's record was last updated at the source on Sep 14, 2026.

Frequently asked questions

How many chargers does Granite Bay Main Beach Parking Lot have?

Granite Bay Main Beach Parking Lot has 2 charging ports: 2 Level 2.

Does Granite Bay Main Beach Parking Lot have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Granite Bay Main Beach Parking Lot have?

Granite Bay Main Beach Parking Lot has J1772 connectors.

Is Granite Bay Main Beach Parking Lot open to the public?

Yes. Granite Bay Main Beach Parking Lot is listed with public access, and its status is available.

Where is Granite Bay Main Beach Parking Lot?

Granite Bay Main Beach Parking Lot is at 500 Folsom Dam Road, Granite Bay, CA 95746. Its coordinates are 38.75562, -121.14874.

More EV charging around Granite Bay

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 218633, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Granite Bay Main Beach Parking Lot, Granite Bay, CA (AFDC station 218633)”, https://chargecensus.com/stations/california/granite-bay-main-beach-parking-lot-218633 (data as of October 12, 2026).