7311 Huntington Square Ln
AvailableEV charging station in Citrus Heights, California on the Loop network — 30 Level 2. US DOE AFDC station 398833.
At a glance
7311 Huntington Square Ln is a public EV charging station at 7311 Huntington Square Ln in Citrus Heights, California, on the Loop network. It has 30 charging ports (30 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 27, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 398833 |
| Network | Loop |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Sep 27, 2023 |
| Last updated at source | Sep 22, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 7311 Huntington Square Ln
- City
- Citrus Heights
- State
- California
- ZIP
- 95621
- Coordinates
- 38.69019, -121.29235
Within ~15 km
Nearby charging
- Folsom Prison43 ports
EV Connect · Available
EV Connect · Available
- Kaiser Permanente Point West32 ports
PowerFlex · Available
- Foothill Farms Senior Housing30 ports
Loop · Available
- Kaiser Permanente Morse Pharmacy30 ports
PowerFlex · Available
- SWTCH Energy27 ports
SWTCH · Available
What kind of charging does 7311 Huntington Square Ln offer?
Of its 30 ports, 30 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 8 times the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.
How does 7311 Huntington Square Ln compare with other stations in Citrus Heights?
Citrus Heights has 12 charging stations in the DOE registry with 107 ports. 7311 Huntington Square Ln accounts for 28% of the charging ports in Citrus Heights. Loop runs 2 stations in Citrus Heights. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates 7311 Huntington Square Ln?
Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 591 of those stations are in California, 3% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 27, 2023, one of 2,598 stations in California with a 2023 open date. The station's record was last updated at the source on Sep 22, 2026.
Frequently asked questions
How many chargers does 7311 Huntington Square Ln have?
7311 Huntington Square Ln has 30 charging ports: 30 Level 2.
Does 7311 Huntington Square Ln have DC fast charging?
No. The registry lists no DC fast ports here; its 30 ports are all Level 2.
What connectors does 7311 Huntington Square Ln have?
7311 Huntington Square Ln has J1772 connectors.
Is 7311 Huntington Square Ln open to the public?
Yes. 7311 Huntington Square Ln is listed with public access, and its status is available.
Where is 7311 Huntington Square Ln?
7311 Huntington Square Ln is at 7311 Huntington Square Ln, Citrus Heights, CA 95621. Its coordinates are 38.69019, -121.29235.
More EV charging around Citrus Heights
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 398833, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “7311 Huntington Square Ln, Citrus Heights, CA (AFDC station 398833)”, https://chargecensus.com/stations/california/7311-huntington-square-ln-398833 (data as of October 12, 2026).