Ethan Conrad #82
AvailableEV charging station in Carmichael, California on the EVgo network — 10 DC fast. US DOE AFDC station 451721.
At a glance
Ethan Conrad #82 is a public EV charging station at 5025 Marconi Ave. in Carmichael, California, on the EVgo network. It has 10 charging ports (10 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Feb 21, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 451721 |
| Network | EVgo |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 21, 2026 |
| Last updated at source | Oct 11, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5025 Marconi Ave.
- City
- Carmichael
- State
- California
- ZIP
- 95608
- Coordinates
- 38.61844, -121.34670
Within ~15 km
Nearby charging
Non-networked · Available
EV Connect · Available
- Kaiser Permanente Point West32 ports
PowerFlex · Available
- Kaiser Permanente Morse Pharmacy30 ports
PowerFlex · Available
- Foothill Farms Senior Housing30 ports
Loop · Available
- 7311 Huntington Square Ln30 ports
Loop · Available
What kind of charging does Ethan Conrad #82 offer?
Of its 10 ports, 10 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 2.7 times the California average of 3.7 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector.
How does Ethan Conrad #82 compare with other stations in Carmichael?
Carmichael has 14 charging stations in the DOE registry with 50 ports. Ethan Conrad #82 accounts for 20% of the charging ports in Carmichael. EVgo runs 2 stations in Carmichael. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates Ethan Conrad #82?
DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 21, 2026, one of 2,420 stations in California with a 2026 open date. The station's record was last updated at the source on Oct 11, 2026.
Frequently asked questions
How many chargers does Ethan Conrad #82 have?
Ethan Conrad #82 has 10 charging ports: 10 DC fast.
Does Ethan Conrad #82 have DC fast charging?
Yes. The registry lists 10 DC fast ports at Ethan Conrad #82, with CCS and NACS (Tesla) connectors.
What connectors does Ethan Conrad #82 have?
Ethan Conrad #82 has CCS and NACS (Tesla) connectors.
Is Ethan Conrad #82 open to the public?
Yes. Ethan Conrad #82 is listed with public access, and its status is available.
Where is Ethan Conrad #82?
Ethan Conrad #82 is at 5025 Marconi Ave., Carmichael, CA 95608. Its coordinates are 38.61844, -121.34670.
More EV charging around Carmichael
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 451721, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ethan Conrad #82, Carmichael, CA (AFDC station 451721)”, https://chargecensus.com/stations/california/ethan-conrad-82-451721 (data as of October 12, 2026).