Maples Boligee Dc 1
AvailableEV charging station in Boligee, Alabama on the ChargePoint network — 1 DC fast. US DOE AFDC station 222122.
At a glance
Maples Boligee Dc 1 is a public EV charging station at 17619 Co Rd 20 in Boligee, Alabama, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jun 29, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 222122 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 29, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 17619 Co Rd 20
- City
- Boligee
- State
- Alabama
- ZIP
- 35443
- Coordinates
- 32.79437, -88.03041
Within ~15 km
Nearby charging
- Maples Boligee Dc 21 ports
ChargePoint · Available
What kind of charging does Maples Boligee Dc 1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 69% below the Alabama average of 3.3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Maples Boligee Dc 1 compare with other stations in Boligee?
Boligee has 2 charging stations in the DOE registry with 2 ports. Maples Boligee Dc 1 accounts for 50% of the charging ports in Boligee. ChargePoint runs 2 stations in Boligee. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.
Who operates Maples Boligee Dc 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 310 of those stations are in Alabama, 45% of the state's 693.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 29, 2022, one of 88 stations in Alabama with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Maples Boligee Dc 1 have?
Maples Boligee Dc 1 has 1 charging port: 1 DC fast.
Does Maples Boligee Dc 1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Maples Boligee Dc 1, with CHAdeMO and CCS connectors.
What connectors does Maples Boligee Dc 1 have?
Maples Boligee Dc 1 has CHAdeMO and CCS connectors.
Is Maples Boligee Dc 1 open to the public?
Yes. Maples Boligee Dc 1 is listed with public access, and its status is available.
Where is Maples Boligee Dc 1?
Maples Boligee Dc 1 is at 17619 Co Rd 20, Boligee, AL 35443. Its coordinates are 32.79437, -88.03041.
More EV charging around Boligee
Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 222122, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Maples Boligee Dc 1, Boligee, AL (AFDC station 222122)”, https://chargecensus.com/stations/alabama/maples-boligee-dc-1-222122 (data as of October 12, 2026).