ChargeCensus

Hyundai at Jasper

Available

EV charging station in Jasper, Alabama on the Blink network — 2 DC fast. US DOE AFDC station 354420.

At a glance

Hyundai at Jasper is a public EV charging station at 4011 Highway 78 East in Jasper, Alabama, on the Blink network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Aug 29, 2024.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID354420
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateAug 29, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
4011 Highway 78 East
City
Jasper
State
Alabama
ZIP
35501
Coordinates
33.83682, -87.22846

Within ~15 km

Nearby charging

What kind of charging does Hyundai at Jasper offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 39% below the Alabama average of 3.3 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Hyundai at Jasper compare with other stations in Jasper?

Jasper has 5 charging stations in the DOE registry with 8 ports. Hyundai at Jasper accounts for 25% of the charging ports in Jasper. It is the only Blink station in Jasper. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.

Who operates Hyundai at Jasper?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 47 of those stations are in Alabama, 7% of the state's 693.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 29, 2024, one of 144 stations in Alabama with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Hyundai at Jasper have?

Hyundai at Jasper has 2 charging ports: 2 DC fast.

Does Hyundai at Jasper have DC fast charging?

Yes. The registry lists 2 DC fast ports at Hyundai at Jasper, with CCS connectors.

What connectors does Hyundai at Jasper have?

Hyundai at Jasper has CCS connectors.

Is Hyundai at Jasper open to the public?

Yes. Hyundai at Jasper is listed with public access, and its status is available.

Where is Hyundai at Jasper?

Hyundai at Jasper is at 4011 Highway 78 East, Jasper, AL 35501. Its coordinates are 33.83682, -87.22846.

More EV charging around Jasper

Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 354420, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Hyundai at Jasper, Jasper, AL (AFDC station 354420)”, https://chargecensus.com/stations/alabama/hyundai-at-jasper-354420 (data as of October 12, 2026).