ChargeCensus

GM - Bentley Chevrolet

Available

EV charging station in Florence, Alabama on the EV Connect network — 1 DC fast. US DOE AFDC station 388956.

At a glance

GM - Bentley Chevrolet is a public EV charging station at 1950 Florence Blvd in Florence, Alabama, on the EV Connect network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Mar 30, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID388956
NetworkEV Connect
StatusAvailable (E)
AccessPublic
Open dateMar 30, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EV Connect

Operates 1,601 stations in the DOE registry — view the full network →

Location

Address
1950 Florence Blvd
City
Florence
State
Alabama
ZIP
35630
Coordinates
34.82311, -87.64695

Within ~15 km

Nearby charging

What kind of charging does GM - Bentley Chevrolet offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 69% below the Alabama average of 3.3 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does GM - Bentley Chevrolet compare with other stations in Florence?

Florence has 5 charging stations in the DOE registry with 22 ports. GM - Bentley Chevrolet accounts for 5% of the charging ports in Florence. It is the only EV Connect station in Florence. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.

Who operates GM - Bentley Chevrolet?

EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 13 of those stations are in Alabama, 2% of the state's 693.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 30, 2025, one of 112 stations in Alabama with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does GM - Bentley Chevrolet have?

GM - Bentley Chevrolet has 1 charging port: 1 DC fast.

Does GM - Bentley Chevrolet have DC fast charging?

Yes. The registry lists 1 DC fast port at GM - Bentley Chevrolet, with CCS connectors.

What connectors does GM - Bentley Chevrolet have?

GM - Bentley Chevrolet has CCS connectors.

Is GM - Bentley Chevrolet open to the public?

Yes. GM - Bentley Chevrolet is listed with public access, and its status is available.

Where is GM - Bentley Chevrolet?

GM - Bentley Chevrolet is at 1950 Florence Blvd, Florence, AL 35630. Its coordinates are 34.82311, -87.64695.

More EV charging around Florence

Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 388956, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “GM - Bentley Chevrolet, Florence, AL (AFDC station 388956)”, https://chargecensus.com/stations/alabama/gm-bentley-chevrolet-388956 (data as of October 12, 2026).