ChargeCensus

Crowne at Cahaba River

Available

EV charging station in Birmingham, Alabama on the Blink network — 4 Level 2. US DOE AFDC station 316576.

At a glance

Crowne at Cahaba River is a public EV charging station at 5050 Cahaba River Road in Birmingham, Alabama, on the Blink network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 2, 2023.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID316576
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateNov 2, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
5050 Cahaba River Road
State
Alabama
ZIP
35243
Coordinates
33.42796, -86.72433

Within ~15 km

Nearby charging

What kind of charging does Crowne at Cahaba River offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 22% above the Alabama average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Crowne at Cahaba River compare with other stations in Birmingham?

Birmingham has 68 charging stations in the DOE registry with 270 ports, the most of 119 cities and towns in Alabama. Crowne at Cahaba River accounts for 1% of the charging ports in Birmingham. Blink runs 11 stations in Birmingham. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.

Who operates Crowne at Cahaba River?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 47 of those stations are in Alabama, 7% of the state's 693.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 2, 2023, one of 102 stations in Alabama with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Crowne at Cahaba River have?

Crowne at Cahaba River has 4 charging ports: 4 Level 2.

Does Crowne at Cahaba River have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Crowne at Cahaba River have?

Crowne at Cahaba River has J1772 connectors.

Is Crowne at Cahaba River open to the public?

Yes. Crowne at Cahaba River is listed with public access, and its status is available.

Where is Crowne at Cahaba River?

Crowne at Cahaba River is at 5050 Cahaba River Road, Birmingham, AL 35243. Its coordinates are 33.42796, -86.72433.

More EV charging around Birmingham

Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 316576, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Crowne at Cahaba River, Birmingham, AL (AFDC station 316576)”, https://chargecensus.com/stations/alabama/crowne-at-cahaba-river-316576 (data as of October 12, 2026).