ChargeCensus

Birmingham Public Parking Lot

Available

EV charging station in Birmingham, Alabama on the Blink network — 4 Level 2. US DOE AFDC station 310687.

At a glance

Birmingham Public Parking Lot is a public EV charging station at 109 41st Street South in Birmingham, Alabama, on the Blink network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 14, 2023.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID310687
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateSep 14, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
109 41st Street South
State
Alabama
ZIP
35222
Coordinates
33.52579, -86.77422

Within ~15 km

Nearby charging

What kind of charging does Birmingham Public Parking Lot offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 22% above the Alabama average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Birmingham Public Parking Lot compare with other stations in Birmingham?

Birmingham has 68 charging stations in the DOE registry with 270 ports, the most of 119 cities and towns in Alabama. Birmingham Public Parking Lot accounts for 1% of the charging ports in Birmingham. Blink runs 11 stations in Birmingham. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.

Who operates Birmingham Public Parking Lot?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 47 of those stations are in Alabama, 7% of the state's 693.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 14, 2023, one of 102 stations in Alabama with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Birmingham Public Parking Lot have?

Birmingham Public Parking Lot has 4 charging ports: 4 Level 2.

Does Birmingham Public Parking Lot have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Birmingham Public Parking Lot have?

Birmingham Public Parking Lot has J1772 connectors.

Is Birmingham Public Parking Lot open to the public?

Yes. Birmingham Public Parking Lot is listed with public access, and its status is available.

Where is Birmingham Public Parking Lot?

Birmingham Public Parking Lot is at 109 41st Street South, Birmingham, AL 35222. Its coordinates are 33.52579, -86.77422.

More EV charging around Birmingham

Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 310687, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Birmingham Public Parking Lot, Birmingham, AL (AFDC station 310687)”, https://chargecensus.com/stations/alabama/birmingham-public-parking-lot-310687 (data as of October 12, 2026).