Alabama Power - Atmore Crew Headquarters
AvailableEV charging station in Atmore, Alabama, not on a charging network — 1 Level 2. US DOE AFDC station 68135.
At a glance
Alabama Power - Atmore Crew Headquarters is a private EV charging station at 104 Jackson St in Atmore, Alabama, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 1, 2015.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 68135 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | Utility |
| Open date | Apr 1, 2015 |
| Last updated at source | Mar 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 104 Jackson St
- City
- Atmore
- State
- Alabama
- ZIP
- 36502
- Coordinates
- 31.02262, -87.49041
Within ~15 km
Nearby charging
- Atmore, AL - Tesla Supercharger12 ports
Tesla Supercharger · Available
FLO · Available
FLO · Available
ChargePoint · Available
ChargePoint · Available
ChargePoint · Temporarily unavailable
What kind of charging does Alabama Power - Atmore Crew Headquarters offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 69% below the Alabama average of 3.3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a utility location.
How does Alabama Power - Atmore Crew Headquarters compare with other stations in Atmore?
Atmore has 7 charging stations in the DOE registry with 23 ports. Alabama Power - Atmore Crew Headquarters accounts for 4% of the charging ports in Atmore. Statewide, Alabama has 693 stations and 2,267 ports, the 28th-largest station count of the 51 states and DC. The biggest station in Alabama, Fort Rucker in Fort Rucker, has 88 ports.
Who operates Alabama Power - Atmore Crew Headquarters?
Alabama Power - Atmore Crew Headquarters is listed as non-networked: its chargers are not run through a charging-network account. Alabama has 126 non-networked stations, 18% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Apr 1, 2015, one of 28 stations in Alabama with a 2015 open date. The station's record was last updated at the source on Mar 12, 2026.
Frequently asked questions
How many chargers does Alabama Power - Atmore Crew Headquarters have?
Alabama Power - Atmore Crew Headquarters has 1 charging port: 1 Level 2.
Does Alabama Power - Atmore Crew Headquarters have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Alabama Power - Atmore Crew Headquarters have?
Alabama Power - Atmore Crew Headquarters has J1772 connectors.
Is Alabama Power - Atmore Crew Headquarters open to the public?
No. Alabama Power - Atmore Crew Headquarters is listed with private access.
Where is Alabama Power - Atmore Crew Headquarters?
Alabama Power - Atmore Crew Headquarters is at 104 Jackson St, Atmore, AL 36502. Its coordinates are 31.02262, -87.49041.
More EV charging around Atmore
Working with Alabama charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 68135, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Alabama Power - Atmore Crew Headquarters, Atmore, AL (AFDC station 68135)”, https://chargecensus.com/stations/alabama/alabama-power-atmore-crew-headquarters-68135 (data as of October 12, 2026).