ChargeCensus

Bpc Level2 Station4

Available

EV charging station in Merrill, Wisconsin on the ChargePoint network — 2 Level 2. US DOE AFDC station 331663.

At a glance

Bpc Level2 Station4 is a public EV charging station at 3000 E Main St in Merrill, Wisconsin, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 4, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID331663
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 4, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
3000 E Main St
City
Merrill
ZIP
54452
Coordinates
45.17909, -89.65785

Within ~15 km

Nearby charging

What kind of charging does Bpc Level2 Station4 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Bpc Level2 Station4 compare with other stations in Merrill?

Merrill has 7 charging stations in the DOE registry with 9 ports. Bpc Level2 Station4 accounts for 22% of the charging ports in Merrill. ChargePoint runs 4 stations in Merrill. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.

Who operates Bpc Level2 Station4?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 4, 2024, one of 170 stations in Wisconsin with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Bpc Level2 Station4 have?

Bpc Level2 Station4 has 2 charging ports: 2 Level 2.

Does Bpc Level2 Station4 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Bpc Level2 Station4 have?

Bpc Level2 Station4 has J1772 connectors.

Is Bpc Level2 Station4 open to the public?

Yes. Bpc Level2 Station4 is listed with public access, and its status is available.

Where is Bpc Level2 Station4?

Bpc Level2 Station4 is at 3000 E Main St, Merrill, WI 54452. Its coordinates are 45.17909, -89.65785.

More EV charging around Merrill

Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 331663, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Bpc Level2 Station4, Merrill, WI (AFDC station 331663)”, https://chargecensus.com/stations/wisconsin/bpc-level2-station4-331663 (data as of October 12, 2026).