Bpc Level 3-1
AvailableEV charging station in Merrill, Wisconsin on the ChargePoint network — 1 DC fast. US DOE AFDC station 347864.
At a glance
Bpc Level 3-1 is a public EV charging station at 3000 E Main St in Merrill, Wisconsin, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jun 14, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 347864 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 14, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3000 E Main St
- City
- Merrill
- State
- Wisconsin
- ZIP
- 54452
- Coordinates
- 45.17871, -89.65783
Within ~15 km
Nearby charging
- Bpc Level2 Station32 ports
ChargePoint · Available
- Bpc Level2 Station42 ports
ChargePoint · Available
FLO · Available
Tesla Destination · Available
- Bpc Level 3-21 ports
ChargePoint · Available
Tesla Destination · Available
What kind of charging does Bpc Level 3-1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 63% below the Wisconsin average of 2.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Bpc Level 3-1 compare with other stations in Merrill?
Merrill has 7 charging stations in the DOE registry with 9 ports. Bpc Level 3-1 accounts for 11% of the charging ports in Merrill. ChargePoint runs 4 stations in Merrill. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Bpc Level 3-1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 14, 2024, one of 170 stations in Wisconsin with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bpc Level 3-1 have?
Bpc Level 3-1 has 1 charging port: 1 DC fast.
Does Bpc Level 3-1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Bpc Level 3-1, with CHAdeMO and CCS connectors.
What connectors does Bpc Level 3-1 have?
Bpc Level 3-1 has CHAdeMO and CCS connectors.
Is Bpc Level 3-1 open to the public?
Yes. Bpc Level 3-1 is listed with public access, and its status is available.
Where is Bpc Level 3-1?
Bpc Level 3-1 is at 3000 E Main St, Merrill, WI 54452. Its coordinates are 45.17871, -89.65783.
More EV charging around Merrill
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 347864, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bpc Level 3-1, Merrill, WI (AFDC station 347864)”, https://chargecensus.com/stations/wisconsin/bpc-level-3-1-347864 (data as of October 12, 2026).