Windermere Real Estate
AvailableEV charging station in Port Townsend, Washington, not on a charging network — 1 Level 2. US DOE AFDC station 66422.
At a glance
Windermere Real Estate is a public EV charging station at 1220 Water St in Port Townsend, Washington, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 4, 2015.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 66422 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Office building |
| Open date | Feb 4, 2015 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 1220 Water St
- City
- Port Townsend
- State
- Washington
- ZIP
- 98368
- Coordinates
- 48.11302, -122.76054
Within ~15 km
Nearby charging
- Jefferson Healthcare16 ports
ChargeLab · Available
- City of Port Townsend9 ports
EVCS · Available
- Jefferson Transit Authority4 ports
Blink · Available
- Power Trip Energy Corp2 ports
Non-networked · Available
Non-networked · Available
- Fec Nw / N1066-B151-12 ports
Non-networked · Available
What kind of charging does Windermere Real Estate offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a office building location.
How does Windermere Real Estate compare with other stations in Port Townsend?
Port Townsend has 11 charging stations in the DOE registry with 41 ports. Windermere Real Estate accounts for 2% of the charging ports in Port Townsend. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Windermere Real Estate?
Windermere Real Estate is listed as non-networked: its chargers are not run through a charging-network account. Washington has 347 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 4, 2015, one of 47 stations in Washington with a 2015 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does Windermere Real Estate have?
Windermere Real Estate has 1 charging port: 1 Level 2.
Does Windermere Real Estate have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Windermere Real Estate have?
Windermere Real Estate has J1772 connectors.
Is charging at Windermere Real Estate free?
Pricing as reported to the DOE registry: Free.
Is Windermere Real Estate open to the public?
Yes. Windermere Real Estate is listed with public access, and its status is available.
Where is Windermere Real Estate?
Windermere Real Estate is at 1220 Water St, Port Townsend, WA 98368. Its coordinates are 48.11302, -122.76054.
More EV charging around Port Townsend
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 66422, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Windermere Real Estate, Port Townsend, WA (AFDC station 66422)”, https://chargecensus.com/stations/washington/windermere-real-estate-66422 (data as of October 12, 2026).