Power Trip Energy Corp
AvailableEV charging station in Port Townsend, Washington, not on a charging network — 2 Level 2. US DOE AFDC station 66418.
At a glance
Power Trip Energy Corp is a public EV charging station at 83 Denny Ave in Port Townsend, Washington, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 1, 2012.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 66418 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Office building |
| Open date | Jun 1, 2012 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 83 Denny Ave
- City
- Port Townsend
- State
- Washington
- ZIP
- 98368
- Coordinates
- 48.09363, -122.81325
Within ~15 km
Nearby charging
- Jefferson Healthcare16 ports
ChargeLab · Available
- City of Port Townsend9 ports
EVCS · Available
- Jefferson Transit Authority4 ports
Blink · Available
- Wild Birds Unlimited2 ports
Non-networked · Available
Non-networked · Available
- Fec Nw / N1066-B151-12 ports
Non-networked · Available
What kind of charging does Power Trip Energy Corp offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a office building location.
How does Power Trip Energy Corp compare with other stations in Port Townsend?
Port Townsend has 11 charging stations in the DOE registry with 41 ports. Power Trip Energy Corp accounts for 5% of the charging ports in Port Townsend. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Power Trip Energy Corp?
Power Trip Energy Corp is listed as non-networked: its chargers are not run through a charging-network account. Washington has 347 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 1, 2012, one of 22 stations in Washington with a 2012 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does Power Trip Energy Corp have?
Power Trip Energy Corp has 2 charging ports: 2 Level 2.
Does Power Trip Energy Corp have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Power Trip Energy Corp have?
Power Trip Energy Corp has J1772 connectors.
Is charging at Power Trip Energy Corp free?
Pricing as reported to the DOE registry: Free.
Is Power Trip Energy Corp open to the public?
Yes. Power Trip Energy Corp is listed with public access, and its status is available.
Where is Power Trip Energy Corp?
Power Trip Energy Corp is at 83 Denny Ave, Port Townsend, WA 98368. Its coordinates are 48.09363, -122.81325.
More EV charging around Port Townsend
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 66418, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Power Trip Energy Corp, Port Townsend, WA (AFDC station 66418)”, https://chargecensus.com/stations/washington/power-trip-energy-corp-66418 (data as of October 12, 2026).