ChargeCensus

Village Garage Distillery-Food

Available

EV charging station in Bennington, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 204973.

At a glance

Village Garage Distillery-Food is a public EV charging station at 107 Depot St in Bennington, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 18, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID204973
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 18, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
107 Depot St
City
Bennington
State
Vermont
ZIP
05201
Coordinates
42.87949, -73.19821

Within ~15 km

Nearby charging

What kind of charging does Village Garage Distillery-Food offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Village Garage Distillery-Food compare with other stations in Bennington?

Bennington has 9 charging stations in the DOE registry with 34 ports, the 12th-most of 122 cities and towns in Vermont. Village Garage Distillery-Food accounts for 6% of the charging ports in Bennington. ChargePoint runs 4 stations in Bennington. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.

Who operates Village Garage Distillery-Food?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 18, 2022, one of 58 stations in Vermont with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Village Garage Distillery-Food have?

Village Garage Distillery-Food has 2 charging ports: 2 Level 2.

Does Village Garage Distillery-Food have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Village Garage Distillery-Food have?

Village Garage Distillery-Food has J1772 connectors.

Is Village Garage Distillery-Food open to the public?

Yes. Village Garage Distillery-Food is listed with public access, and its status is available.

Where is Village Garage Distillery-Food?

Village Garage Distillery-Food is at 107 Depot St, Bennington, VT 05201. Its coordinates are 42.87949, -73.19821.

More EV charging around Bennington

Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 204973, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Village Garage Distillery-Food, Bennington, VT (AFDC station 204973)”, https://chargecensus.com/stations/vermont/village-garage-distillery-food-204973 (data as of October 12, 2026).