Bc1 Eastern Unit
AvailableEV charging station in North Bennington, Vermont on the ChargePoint network — 2 Level 2. US DOE AFDC station 221146.
At a glance
Bc1 Eastern Unit is a public EV charging station at 398 Dwyers Camp Rd in North Bennington, Vermont, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 10, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 221146 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 10, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 398 Dwyers Camp Rd
- City
- North Bennington
- State
- Vermont
- ZIP
- 05257
- Coordinates
- 42.91936, -73.24068
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- 80 Church St4 ports
ViaLynk · Temporarily unavailable
- Town of Bennington2 ports
Blink · Available
- Benningtonvt Bennington Ev22 ports
ChargePoint · Available
ChargePoint · Available
- Benningtonvt Bennington Ev12 ports
ChargePoint · Available
What kind of charging does Bc1 Eastern Unit offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 21% below the Vermont average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bc1 Eastern Unit compare with other stations in North Bennington?
North Bennington has 3 charging stations in the DOE registry with 6 ports. Bc1 Eastern Unit accounts for 33% of the charging ports in North Bennington. ChargePoint runs 3 stations in North Bennington. Statewide, Vermont has 581 stations and 1,476 ports, the 31st-largest station count of the 51 states and DC. The biggest station in Vermont, OnLogic in South Burlington, has 24 ports.
Who operates Bc1 Eastern Unit?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 298 of those stations are in Vermont, 51% of the state's 581.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 10, 2022, one of 58 stations in Vermont with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bc1 Eastern Unit have?
Bc1 Eastern Unit has 2 charging ports: 2 Level 2.
Does Bc1 Eastern Unit have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bc1 Eastern Unit have?
Bc1 Eastern Unit has J1772 connectors.
Is Bc1 Eastern Unit open to the public?
Yes. Bc1 Eastern Unit is listed with public access, and its status is available.
Where is Bc1 Eastern Unit?
Bc1 Eastern Unit is at 398 Dwyers Camp Rd, North Bennington, VT 05257. Its coordinates are 42.91936, -73.24068.
More EV charging around North Bennington
Working with Vermont charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 221146, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bc1 Eastern Unit, North Bennington, VT (AFDC station 221146)”, https://chargecensus.com/stations/vermont/bc1-eastern-unit-221146 (data as of October 12, 2026).