ChargeCensus

Stellantis

Available

EV charging station in Cedar City, Utah on the Blink network — 2 DC fast. US DOE AFDC station 387853.

At a glance

Stellantis is a public EV charging station at 1010 North Main Street in Cedar City, Utah, on the Blink network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Mar 13, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID387853
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateMar 13, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
1010 North Main Street
State
Utah
ZIP
84721
Coordinates
37.69427, -113.06188

Within ~15 km

Nearby charging

What kind of charging does Stellantis offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does Stellantis compare with other stations in Cedar City?

Cedar City has 14 charging stations in the DOE registry with 69 ports, the 18th-most of 119 cities and towns in Utah. Stellantis accounts for 3% of the charging ports in Cedar City. Blink runs 4 stations in Cedar City. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.

Who operates Stellantis?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 69 of those stations are in Utah, 6% of the state's 1,090.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 13, 2025, one of 142 stations in Utah with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Stellantis have?

Stellantis has 2 charging ports: 2 DC fast.

Does Stellantis have DC fast charging?

Yes. The registry lists 2 DC fast ports at Stellantis, with CCS connectors.

What connectors does Stellantis have?

Stellantis has CCS connectors.

Is Stellantis open to the public?

Yes. Stellantis is listed with public access, and its status is available.

Where is Stellantis?

Stellantis is at 1010 North Main Street, Cedar City, UT 84721. Its coordinates are 37.69427, -113.06188.

More EV charging around Cedar City

Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 387853, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Stellantis, Cedar City, UT (AFDC station 387853)”, https://chargecensus.com/stations/utah/stellantis-387853 (data as of October 12, 2026).