RCS Rocket Motor Components, Inc
AvailableEV charging station in Cedar City, Utah, not on a charging network — 4 Level 2. US DOE AFDC station 123370.
At a glance
RCS Rocket Motor Components, Inc is a private EV charging station at 2053 W 850 N in Cedar City, Utah, not attached to a charging network. It has 4 charging ports (4 Level 2) with NACS (Tesla) connectors. The US DOE registry lists it as available, open since Jan 1, 2015.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 123370 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Private |
| Facility | Other |
| Open date | Jan 1, 2015 |
| Last updated at source | Feb 12, 2025 |
Plugs
Connectors & pricing
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2053 W 850 N
- City
- Cedar City
- State
- Utah
- ZIP
- 84721
- Coordinates
- 37.69129, -113.08841
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Electrify America · Available
Tesla Destination · Available
Tesla Destination · Available
Blink · Available
What kind of charging does RCS Rocket Motor Components, Inc offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% above the Utah average of 3.2 ports per station. The registry lists one connector type: NACS (Tesla), the North American Charging Standard connector. The site is listed as a other location. It is flagged as workplace charging.
How does RCS Rocket Motor Components, Inc compare with other stations in Cedar City?
Cedar City has 14 charging stations in the DOE registry with 69 ports, the 18th-most of 119 cities and towns in Utah. RCS Rocket Motor Components, Inc accounts for 6% of the charging ports in Cedar City. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.
Who operates RCS Rocket Motor Components, Inc?
RCS Rocket Motor Components, Inc is listed as non-networked: its chargers are not run through a charging-network account. Utah has 105 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is private, meaning use is restricted, for example to a fleet, employees or residents. It opened on Jan 1, 2015, one of 19 stations in Utah with a 2015 open date. The station's record was last updated at the source on Feb 12, 2025.
Frequently asked questions
How many chargers does RCS Rocket Motor Components, Inc have?
RCS Rocket Motor Components, Inc has 4 charging ports: 4 Level 2.
Does RCS Rocket Motor Components, Inc have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does RCS Rocket Motor Components, Inc have?
RCS Rocket Motor Components, Inc has NACS (Tesla) connectors.
Is RCS Rocket Motor Components, Inc open to the public?
No. RCS Rocket Motor Components, Inc is listed with private access.
Where is RCS Rocket Motor Components, Inc?
RCS Rocket Motor Components, Inc is at 2053 W 850 N, Cedar City, UT 84721. Its coordinates are 37.69129, -113.08841.
More EV charging around Cedar City
Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 123370, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “RCS Rocket Motor Components, Inc, Cedar City, UT (AFDC station 123370)”, https://chargecensus.com/stations/utah/rcs-rocket-motor-components-inc-123370 (data as of October 12, 2026).