ChargeCensus

Sco Cch2

Available

EV charging station in Cedar City, Utah on the ChargePoint network — 2 Level 2. US DOE AFDC station 175512.

At a glance

Sco Cch2 is a public EV charging station at 108 W 1325 N in Cedar City, Utah, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID175512
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
108 W 1325 N
State
Utah
ZIP
84721
Coordinates
37.70032, -113.06521

Within ~15 km

Nearby charging

What kind of charging does Sco Cch2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the Utah average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Sco Cch2 compare with other stations in Cedar City?

Cedar City has 14 charging stations in the DOE registry with 69 ports, the 18th-most of 119 cities and towns in Utah. Sco Cch2 accounts for 3% of the charging ports in Cedar City. ChargePoint runs 3 stations in Cedar City. Statewide, Utah has 1,090 stations and 3,472 ports, the 23rd-largest station count of the 51 states and DC. The biggest station in Utah, Avia - The Exchange Apartments - SLC in Salt Lake City, has 38 ports.

Who operates Sco Cch2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 670 of those stations are in Utah, 61% of the state's 1,090.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 232 stations in Utah with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Sco Cch2 have?

Sco Cch2 has 2 charging ports: 2 Level 2.

Does Sco Cch2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Sco Cch2 have?

Sco Cch2 has J1772 connectors.

Is Sco Cch2 open to the public?

Yes. Sco Cch2 is listed with public access, and its status is available.

Where is Sco Cch2?

Sco Cch2 is at 108 W 1325 N, Cedar City, UT 84721. Its coordinates are 37.70032, -113.06521.

More EV charging around Cedar City

Working with Utah charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 175512, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Sco Cch2, Cedar City, UT (AFDC station 175512)”, https://chargecensus.com/stations/utah/sco-cch2-175512 (data as of October 12, 2026).