The Ellery at Westchester
AvailableEV charging station in Grand Prairie, Texas on the Graviti Energy network — 4 Level 2. US DOE AFDC station 396055.
At a glance
The Ellery at Westchester is a public EV charging station at 4210 Dechman Dr in Grand Prairie, Texas, on the Graviti Energy network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 21, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 396055 |
| Network | Graviti Energy |
| Status | Available (E) |
| Access | Public |
| Open date | May 21, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 4210 Dechman Dr
- City
- Grand Prairie
- State
- Texas
- ZIP
- 75052
- Coordinates
- 32.67085, -96.99799
Within ~15 km
Nearby charging
- Americana Garage16 ports
Blink · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- WinCo Foods - Arlington 13510 ports
EVgo · Available
IONNA · Available
- Loews Arlington Hotel10 ports
Blink · Available
What kind of charging does The Ellery at Westchester offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 16% above the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Ellery at Westchester compare with other stations in Grand Prairie?
Grand Prairie has 34 charging stations in the DOE registry with 121 ports, the 16th-most of 424 cities and towns in Texas. The Ellery at Westchester accounts for 3% of the charging ports in Grand Prairie. Graviti Energy runs 2 stations in Grand Prairie. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.
Who operates The Ellery at Westchester?
Graviti Energy operates 76 stations in the registry across 3 states, with 102 DC fast and 210 Level 2 ports in total. 73 of those stations are in Texas, 2% of the state's 4,155.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 21, 2025, one of 700 stations in Texas with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Ellery at Westchester have?
The Ellery at Westchester has 4 charging ports: 4 Level 2.
Does The Ellery at Westchester have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does The Ellery at Westchester have?
The Ellery at Westchester has J1772 connectors.
Is The Ellery at Westchester open to the public?
Yes. The Ellery at Westchester is listed with public access, and its status is available.
Where is The Ellery at Westchester?
The Ellery at Westchester is at 4210 Dechman Dr, Grand Prairie, TX 75052. Its coordinates are 32.67085, -96.99799.
More EV charging around Grand Prairie
Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 396055, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Ellery at Westchester, Grand Prairie, TX (AFDC station 396055)”, https://chargecensus.com/stations/texas/the-ellery-at-westchester-396055 (data as of October 12, 2026).