ChargeCensus

Americana Garage

Available

EV charging station in Arlington, Texas on the Blink network — 16 Level 2. US DOE AFDC station 456342.

At a glance

Americana Garage is a public EV charging station at 1300 Ballpark Way in Arlington, Texas, on the Blink network. It has 16 charging ports (16 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 4, 2026.

Total ports
16
DC fast
0
Level 2
16
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID456342
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateFeb 4, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
1300 Ballpark Way
State
Texas
ZIP
76011
Coordinates
32.75638, -97.08186

Within ~15 km

Nearby charging

What kind of charging does Americana Garage offer?

Of its 16 ports, 16 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 4.6 times the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Americana Garage compare with other stations in Arlington?

Arlington has 45 charging stations in the DOE registry with 150 ports, the 10th-most of 424 cities and towns in Texas. Americana Garage accounts for 11% of the charging ports in Arlington. Blink runs 4 stations in Arlington. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Americana Garage?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 410 of those stations are in Texas, 10% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 4, 2026, one of 379 stations in Texas with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Americana Garage have?

Americana Garage has 16 charging ports: 16 Level 2.

Does Americana Garage have DC fast charging?

No. The registry lists no DC fast ports here; its 16 ports are all Level 2.

What connectors does Americana Garage have?

Americana Garage has J1772 connectors.

Is Americana Garage open to the public?

Yes. Americana Garage is listed with public access, and its status is available.

Where is Americana Garage?

Americana Garage is at 1300 Ballpark Way, Arlington, TX 76011. Its coordinates are 32.75638, -97.08186.

More EV charging around Arlington

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 456342, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Americana Garage, Arlington, TX (AFDC station 456342)”, https://chargecensus.com/stations/texas/americana-garage-456342 (data as of October 12, 2026).