ChargeCensus

Hyundai Pad EV Nrich Hill 1

Available

EV charging station in North Richland Hills, Texas on the ChargePoint network — 1 Level 2. US DOE AFDC station 202410.

At a glance

Hyundai Pad EV Nrich Hill 1 is a public EV charging station at 7755 NE Loop 820 in North Richland Hills, Texas, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 11, 2021.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID202410
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 11, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
7755 NE Loop 820
City
North Richland Hills
State
Texas
ZIP
76180
Coordinates
32.83416, -97.21535

Within ~15 km

Nearby charging

What kind of charging does Hyundai Pad EV Nrich Hill 1 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Texas average of 3.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Hyundai Pad EV Nrich Hill 1 compare with other stations in North Richland Hills?

North Richland Hills has 9 charging stations in the DOE registry with 45 ports. Hyundai Pad EV Nrich Hill 1 accounts for 2% of the charging ports in North Richland Hills. ChargePoint runs 2 stations in North Richland Hills. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates Hyundai Pad EV Nrich Hill 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,882 of those stations are in Texas, 45% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 11, 2021, one of 459 stations in Texas with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Hyundai Pad EV Nrich Hill 1 have?

Hyundai Pad EV Nrich Hill 1 has 1 charging port: 1 Level 2.

Does Hyundai Pad EV Nrich Hill 1 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Hyundai Pad EV Nrich Hill 1 have?

Hyundai Pad EV Nrich Hill 1 has J1772 connectors.

Is Hyundai Pad EV Nrich Hill 1 open to the public?

Yes. Hyundai Pad EV Nrich Hill 1 is listed with public access, and its status is available.

Where is Hyundai Pad EV Nrich Hill 1?

Hyundai Pad EV Nrich Hill 1 is at 7755 NE Loop 820, North Richland Hills, TX 76180. Its coordinates are 32.83416, -97.21535.

More EV charging around North Richland Hills

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 202410, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Hyundai Pad EV Nrich Hill 1, North Richland Hills, TX (AFDC station 202410)”, https://chargecensus.com/stations/texas/hyundai-pad-ev-nrich-hill-1-202410 (data as of October 12, 2026).