Gateway of Euless
AvailableEV charging station in Euless, Texas on the EVgo network — 4 DC fast. US DOE AFDC station 373076.
At a glance
Gateway of Euless is a public EV charging station at 3050 Highway 360 in Euless, Texas, on the EVgo network. It has 4 charging ports (4 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Dec 14, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 373076 |
| Network | EVgo |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 14, 2024 |
| Last updated at source | Oct 11, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
bp pulse · Available
- Nissan Motor Acceptance Corp18 ports
Non-networked · Available
- Americana Garage16 ports
Blink · Available
Tesla Supercharger · Available
- Genesis Lab13 ports
Non-networked · Available
- Walmart EV Charging12 ports
Walmart · Available
What kind of charging does Gateway of Euless offer?
Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 16% above the Texas average of 3.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Gateway of Euless compare with other stations in Euless?
Euless has 14 charging stations in the DOE registry with 56 ports. Gateway of Euless accounts for 7% of the charging ports in Euless. It is the only EVgo station in Euless. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.
Who operates Gateway of Euless?
DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 92 of those stations are in Texas, 2% of the state's 4,155.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 14, 2024, one of 715 stations in Texas with a 2024 open date. The station's record was last updated at the source on Oct 11, 2026.
Frequently asked questions
How many chargers does Gateway of Euless have?
Gateway of Euless has 4 charging ports: 4 DC fast.
Does Gateway of Euless have DC fast charging?
Yes. The registry lists 4 DC fast ports at Gateway of Euless, with CHAdeMO and CCS connectors.
What connectors does Gateway of Euless have?
Gateway of Euless has CHAdeMO and CCS connectors.
Is Gateway of Euless open to the public?
Yes. Gateway of Euless is listed with public access, and its status is available.
Where is Gateway of Euless?
Gateway of Euless is at 3050 Highway 360, Euless, TX 76039. Its coordinates are 32.88052, -97.07411.
More EV charging around Euless
Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 373076, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gateway of Euless, Euless, TX (AFDC station 373076)”, https://chargecensus.com/stations/texas/gateway-of-euless-373076 (data as of October 12, 2026).