ChargeCensus

7990 Precinct Line Rd

Available

EV charging station in Colleyville, Texas on the Shell Recharge network — 4 DC fast. US DOE AFDC station 448445.

At a glance

7990 Precinct Line Rd is a public EV charging station at 7990 Precinct Line Rd in Colleyville, Texas, on the Shell Recharge network. It has 4 charging ports (4 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Dec 31, 2025.

Total ports
4
DC fast
4
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID448445
NetworkShell Recharge
StatusAvailable (E)
AccessPublic
Open dateDec 31, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Shell Recharge

Operates 87 stations in the DOE registry — view the full network →

Location

Address
7990 Precinct Line Rd
City
Colleyville
State
Texas
ZIP
76034
Coordinates
32.89210, -97.18470

Within ~15 km

Nearby charging

What kind of charging does 7990 Precinct Line Rd offer?

Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 16% above the Texas average of 3.5 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does 7990 Precinct Line Rd compare with other stations in Colleyville?

Colleyville has 1 charging station in the DOE registry with 4 ports. It is the only Shell Recharge station in Colleyville. Statewide, Texas has 4,155 stations and 14,335 ports, the 5th-largest station count of the 51 states and DC. The biggest station in Texas, Bryan Tx Sdc in Bryan, has 122 ports.

Who operates 7990 Precinct Line Rd?

Formerly Greenlots — Shell's charging network. Shell Recharge operates 87 stations in the registry across 15 states, with 563 DC fast and 71 Level 2 ports in total. 34 of those stations are in Texas, under 1% of the state's 4,155.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 31, 2025, one of 700 stations in Texas with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 7990 Precinct Line Rd have?

7990 Precinct Line Rd has 4 charging ports: 4 DC fast.

Does 7990 Precinct Line Rd have DC fast charging?

Yes. The registry lists 4 DC fast ports at 7990 Precinct Line Rd, with CCS connectors.

What connectors does 7990 Precinct Line Rd have?

7990 Precinct Line Rd has CCS connectors.

Is 7990 Precinct Line Rd open to the public?

Yes. 7990 Precinct Line Rd is listed with public access, and its status is available.

Where is 7990 Precinct Line Rd?

7990 Precinct Line Rd is at 7990 Precinct Line Rd, Colleyville, TX 76034. Its coordinates are 32.89210, -97.18470.

More EV charging around Colleyville

Working with Texas charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 448445, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “7990 Precinct Line Rd, Colleyville, TX (AFDC station 448445)”, https://chargecensus.com/stations/texas/7990-precinct-line-rd-448445 (data as of October 12, 2026).