ChargeCensus

Ri Energy Kohlssmithfield

Available

EV charging station in Smithfield, Rhode Island on the ChargePoint network — 2 Level 2. US DOE AFDC station 53055.

At a glance

Ri Energy Kohlssmithfield is a public EV charging station at 371 Putnam Pike in Smithfield, Rhode Island, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 15, 2013.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID53055
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 15, 2013
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
371 Putnam Pike
ZIP
02917
Coordinates
41.87381, -71.51958

Within ~15 km

Nearby charging

What kind of charging does Ri Energy Kohlssmithfield offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Rhode Island average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ri Energy Kohlssmithfield compare with other stations in Smithfield?

Smithfield has 12 charging stations in the DOE registry with 55 ports, the 9th-most of 39 cities and towns in Rhode Island. Ri Energy Kohlssmithfield accounts for 4% of the charging ports in Smithfield. ChargePoint runs 10 stations in Smithfield. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.

Who operates Ri Energy Kohlssmithfield?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in Rhode Island, 78% of the state's 386.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 15, 2013, one of 10 stations in Rhode Island with a 2013 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ri Energy Kohlssmithfield have?

Ri Energy Kohlssmithfield has 2 charging ports: 2 Level 2.

Does Ri Energy Kohlssmithfield have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Ri Energy Kohlssmithfield have?

Ri Energy Kohlssmithfield has J1772 connectors.

Is Ri Energy Kohlssmithfield open to the public?

Yes. Ri Energy Kohlssmithfield is listed with public access, and its status is available.

Where is Ri Energy Kohlssmithfield?

Ri Energy Kohlssmithfield is at 371 Putnam Pike, Smithfield, RI 02917. Its coordinates are 41.87381, -71.51958.

More EV charging around Smithfield

Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 53055, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ri Energy Kohlssmithfield, Smithfield, RI (AFDC station 53055)”, https://chargecensus.com/stations/rhode-island/ri-energy-kohlssmithfield-53055 (data as of October 12, 2026).