ChargeCensus

Mulligan's Island

Available

EV charging station in Cranston, Rhode Island on the AmpUp network — 8 Level 2. US DOE AFDC station 221117.

At a glance

Mulligan's Island is a public EV charging station at 1000 New London Ave in Cranston, Rhode Island, on the AmpUp network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 6, 2022.

Total ports
8
DC fast
0
Level 2
8
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID221117
NetworkAmpUp
StatusAvailable (E)
AccessPublic
FacilityParking lot
Open dateJun 6, 2022
Last updated at sourceOct 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.30 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
1000 New London Ave
ZIP
02920
Coordinates
41.74186, -71.47194

Within ~15 km

Nearby charging

What kind of charging does Mulligan's Island offer?

Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3 times the Rhode Island average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.30 per kWh”. The site is listed as a parking lot location.

How does Mulligan's Island compare with other stations in Cranston?

Cranston has 21 charging stations in the DOE registry with 50 ports, the 4th-most of 39 cities and towns in Rhode Island. Mulligan's Island accounts for 16% of the charging ports in Cranston. It is the only AmpUp station in Cranston. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.

Who operates Mulligan's Island?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 12 of those stations are in Rhode Island, 3% of the state's 386.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 6, 2022, one of 62 stations in Rhode Island with a 2022 open date. The station's record was last updated at the source on Oct 2, 2026.

Frequently asked questions

How many chargers does Mulligan's Island have?

Mulligan's Island has 8 charging ports: 8 Level 2.

Does Mulligan's Island have DC fast charging?

No. The registry lists no DC fast ports here; its 8 ports are all Level 2.

What connectors does Mulligan's Island have?

Mulligan's Island has J1772 connectors.

Is charging at Mulligan's Island free?

Pricing as reported to the DOE registry: $0.30 per kWh.

Is Mulligan's Island open to the public?

Yes. Mulligan's Island is listed with public access, and its status is available.

Where is Mulligan's Island?

Mulligan's Island is at 1000 New London Ave, Cranston, RI 02920. Its coordinates are 41.74186, -71.47194.

More EV charging around Cranston

Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 221117, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Mulligan's Island, Cranston, RI (AFDC station 221117)”, https://chargecensus.com/stations/rhode-island/mulligan-s-island-221117 (data as of October 12, 2026).