113 South Lifted
AvailableEV charging station in Providence, Rhode Island on the ChargePoint network — 2 Level 2. US DOE AFDC station 104482.
At a glance
113 South Lifted is a public EV charging station at 44 Hospital Street in Providence, Rhode Island, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 2, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 104482 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 2, 2018 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 44 Hospital Street
- City
- Providence
- State
- Rhode Island
- ZIP
- 02903
- Coordinates
- 41.81687, -71.41009
Within ~15 km
Nearby charging
- Smithfield GWC31 ports
Non-networked · Available
- Attleboro High School16 ports
Non-networked · Available
Non-networked · Available
- Citizen's Bank Johnston12 ports
AmpUp · Available
- Santander Bank10 ports
AmpUp · Available
- Mulligan's Island8 ports
AmpUp · Available
What kind of charging does 113 South Lifted offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Rhode Island average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 113 South Lifted compare with other stations in Providence?
Providence has 89 charging stations in the DOE registry with 217 ports, the most of 39 cities and towns in Rhode Island. 113 South Lifted accounts for under 1% of the charging ports in Providence. ChargePoint runs 78 stations in Providence. Statewide, Rhode Island has 386 stations and 1,046 ports, the 39th-largest station count of the 51 states and DC. The biggest station in Rhode Island, Naval Facilities Engineering Command - Naval Station Newport - Building LP20 in Newport, has 38 ports.
Who operates 113 South Lifted?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in Rhode Island, 78% of the state's 386.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 2, 2018, one of 28 stations in Rhode Island with a 2018 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 113 South Lifted have?
113 South Lifted has 2 charging ports: 2 Level 2.
Does 113 South Lifted have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 113 South Lifted have?
113 South Lifted has J1772 connectors.
Is 113 South Lifted open to the public?
Yes. 113 South Lifted is listed with public access, and its status is available.
Where is 113 South Lifted?
113 South Lifted is at 44 Hospital Street, Providence, RI 02903. Its coordinates are 41.81687, -71.41009.
More EV charging around Providence
Working with Rhode Island charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 104482, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “113 South Lifted, Providence, RI (AFDC station 104482)”, https://chargecensus.com/stations/rhode-island/113-south-lifted-104482 (data as of October 12, 2026).