Geisinger Station05
AvailableEV charging station in Danville, Pennsylvania on the ChargePoint network — 2 Level 2. US DOE AFDC station 173258.
At a glance
Geisinger Station05 is a public EV charging station at 117 Ardmoor Ave in Danville, Pennsylvania, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 173258 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 117 Ardmoor Ave
- City
- Danville
- State
- Pennsylvania
- ZIP
- 17821
- Coordinates
- 40.96777, -76.60070
Within ~15 km
Nearby charging
- 82 Pine Swamp Rd8 ports
Epic Charging · Available
Tesla Supercharger · Available
- Magnolia Court6 ports
evGateway · Available
- Geisinger Station012 ports
ChargePoint · Available
- Geisinger Station 32 ports
ChargePoint · Available
- Geisinger Station022 ports
ChargePoint · Available
What kind of charging does Geisinger Station05 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 31% below the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Geisinger Station05 compare with other stations in Danville?
Danville has 7 charging stations in the DOE registry with 18 ports. Geisinger Station05 accounts for 11% of the charging ports in Danville. ChargePoint runs 6 stations in Danville. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.
Who operates Geisinger Station05?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,223 of those stations are in Pennsylvania, 55% of the state's 2,244.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 287 stations in Pennsylvania with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Geisinger Station05 have?
Geisinger Station05 has 2 charging ports: 2 Level 2.
Does Geisinger Station05 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Geisinger Station05 have?
Geisinger Station05 has J1772 connectors.
Is Geisinger Station05 open to the public?
Yes. Geisinger Station05 is listed with public access, and its status is available.
Where is Geisinger Station05?
Geisinger Station05 is at 117 Ardmoor Ave, Danville, PA 17821. Its coordinates are 40.96777, -76.60070.
More EV charging around Danville
Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 173258, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Geisinger Station05, Danville, PA (AFDC station 173258)”, https://chargecensus.com/stations/pennsylvania/geisinger-station05-173258 (data as of October 12, 2026).