82 Pine Swamp Rd
AvailableEV charging station in Elysburg, Pennsylvania on the Epic Charging network — 8 Level 2. US DOE AFDC station 351611.
At a glance
82 Pine Swamp Rd is a public EV charging station at 82 Pine Swamp Rd in Elysburg, Pennsylvania, on the Epic Charging network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 1, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 351611 |
| Network | Epic Charging |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Jul 1, 2024 |
| Last updated at source | Jun 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: $2 per hr; $25 per hour idle fee
Location
- Address
- 82 Pine Swamp Rd
- City
- Elysburg
- State
- Pennsylvania
- ZIP
- 17824
- Coordinates
- 40.88037, -76.49723
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Magnolia Court6 ports
evGateway · Available
- Sheetz 213 Bloomsburg PA4 ports
Electrify America · Available
Tesla Destination · Available
- Geisinger Station022 ports
ChargePoint · Available
- Geisinger Station 32 ports
ChargePoint · Available
What kind of charging does 82 Pine Swamp Rd offer?
Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.8 times the Pennsylvania average of 2.9 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$2 per hr; $25 per hour idle fee”. The site is listed as a parking lot location.
How does 82 Pine Swamp Rd compare with other stations in Elysburg?
Elysburg has 1 charging station in the DOE registry with 8 ports. It is the only Epic Charging station in Elysburg. Statewide, Pennsylvania has 2,244 stations and 6,458 ports, the 10th-largest station count of the 51 states and DC. The biggest station in Pennsylvania, Erie Pa Sdc in Erie, has 56 ports.
Who operates 82 Pine Swamp Rd?
Epic Charging operates 26 stations in the registry across 16 states, with 2 DC fast and 133 Level 2 ports in total. 2 of those stations are in Pennsylvania, under 1% of the state's 2,244. By port count this is the 5th-biggest Epic Charging station in the country.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 1, 2024, one of 345 stations in Pennsylvania with a 2024 open date. The station's record was last updated at the source on Jun 12, 2026.
Frequently asked questions
How many chargers does 82 Pine Swamp Rd have?
82 Pine Swamp Rd has 8 charging ports: 8 Level 2.
Does 82 Pine Swamp Rd have DC fast charging?
No. The registry lists no DC fast ports here; its 8 ports are all Level 2.
What connectors does 82 Pine Swamp Rd have?
82 Pine Swamp Rd has J1772 connectors.
Is charging at 82 Pine Swamp Rd free?
Pricing as reported to the DOE registry: $2 per hr; $25 per hour idle fee.
Is 82 Pine Swamp Rd open to the public?
Yes. 82 Pine Swamp Rd is listed with public access, and its status is available.
Where is 82 Pine Swamp Rd?
82 Pine Swamp Rd is at 82 Pine Swamp Rd, Elysburg, PA 17824. Its coordinates are 40.88037, -76.49723.
More EV charging around Elysburg
Working with Pennsylvania charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 351611, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “82 Pine Swamp Rd, Elysburg, PA (AFDC station 351611)”, https://chargecensus.com/stations/pennsylvania/82-pine-swamp-rd-351611 (data as of October 12, 2026).