Pacific Power Bend Level 2
AvailableEV charging station in Bend, Oregon on the ChargePoint network — 2 Level 2. US DOE AFDC station 175247.
At a glance
Pacific Power Bend Level 2 is a public EV charging station at 70 NW Newport Ave in Bend, Oregon, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 175247 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Tumalo, OR6 ports
Rivian Adventure Network · Available
- District 2 East6 ports
Blink · Available
- Solis At Petrosa6 ports
Blink · Available
- Walmart 2075 (Bend, OR)4 ports
Electrify America · Available
What kind of charging does Pacific Power Bend Level 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Pacific Power Bend Level 2 compare with other stations in Bend?
Bend has 72 charging stations in the DOE registry with 155 ports, the 5th-most of 194 cities and towns in Oregon. Pacific Power Bend Level 2 accounts for 1% of the charging ports in Bend. ChargePoint runs 44 stations in Bend. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Pacific Power Bend Level 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 195 stations in Oregon with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pacific Power Bend Level 2 have?
Pacific Power Bend Level 2 has 2 charging ports: 2 Level 2.
Does Pacific Power Bend Level 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Pacific Power Bend Level 2 have?
Pacific Power Bend Level 2 has J1772 connectors.
Is Pacific Power Bend Level 2 open to the public?
Yes. Pacific Power Bend Level 2 is listed with public access, and its status is available.
Where is Pacific Power Bend Level 2?
Pacific Power Bend Level 2 is at 70 NW Newport Ave, Bend, OR 97703. Its coordinates are 44.06102, -121.31327.
More EV charging around Bend
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 175247, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pacific Power Bend Level 2, Bend, OR (AFDC station 175247)”, https://chargecensus.com/stations/oregon/pacific-power-bend-level-2-175247 (data as of October 12, 2026).