Walmart 2075 (Bend, OR)
AvailableEV charging station in Bend, Oregon on the Electrify America network — 4 DC fast. US DOE AFDC station 190192.
At a glance
Walmart 2075 (Bend, OR) is a public EV charging station at 20120 SW Pinebrook Blvd in Bend, Oregon, on the Electrify America network. It has 4 charging ports (4 DC fast) with CCS connectors. The US DOE registry lists it as available, open since May 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 190192 |
| Network | Electrify America |
| Status | Available (E) |
| Access | Public |
| Open date | May 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Charging network
Operates 1,221 stations in the DOE registry — view the full network →
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Tumalo, OR6 ports
Rivian Adventure Network · Available
- District 2 East6 ports
Blink · Available
- Solis At Petrosa6 ports
Blink · Available
- Deschutes National Forest4 ports
Non-networked · Available
What kind of charging does Walmart 2075 (Bend, OR) offer?
Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 52% above the Oregon average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Walmart 2075 (Bend, OR) compare with other stations in Bend?
Bend has 72 charging stations in the DOE registry with 155 ports, the 5th-most of 194 cities and towns in Oregon. Walmart 2075 (Bend, OR) accounts for 3% of the charging ports in Bend. It is the only Electrify America station in Bend. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates Walmart 2075 (Bend, OR)?
The Volkswagen-founded DC fast network along highway corridors. Electrify America operates 1,221 stations in the registry across 48 states, with 6,029 DC fast and 170 Level 2 ports in total. 35 of those stations are in Oregon, 2% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 27, 2021, one of 195 stations in Oregon with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Walmart 2075 (Bend, OR) have?
Walmart 2075 (Bend, OR) has 4 charging ports: 4 DC fast.
Does Walmart 2075 (Bend, OR) have DC fast charging?
Yes. The registry lists 4 DC fast ports at Walmart 2075 (Bend, OR), with CCS connectors.
What connectors does Walmart 2075 (Bend, OR) have?
Walmart 2075 (Bend, OR) has CCS connectors.
Is Walmart 2075 (Bend, OR) open to the public?
Yes. Walmart 2075 (Bend, OR) is listed with public access, and its status is available.
Where is Walmart 2075 (Bend, OR)?
Walmart 2075 (Bend, OR) is at 20120 SW Pinebrook Blvd, Bend, OR 97702. Its coordinates are 44.02256, -121.31675.
More EV charging around Bend
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 190192, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Walmart 2075 (Bend, OR), Bend, OR (AFDC station 190192)”, https://chargecensus.com/stations/oregon/walmart-2075-bend-or-190192 (data as of October 12, 2026).