ChargeCensus

Osu Fairbanks South

Available

EV charging station in Corvallis, Oregon on the ChargePoint network — 1 Level 2. US DOE AFDC station 71288.

At a glance

Osu Fairbanks South is a public EV charging station at 220 SW 26th St in Corvallis, Oregon, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 24, 2015.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID71288
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 24, 2015
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
220 SW 26th St
State
Oregon
ZIP
97331
Coordinates
44.56488, -123.28056

Within ~15 km

Nearby charging

What kind of charging does Osu Fairbanks South offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Osu Fairbanks South compare with other stations in Corvallis?

Corvallis has 32 charging stations in the DOE registry with 69 ports, the 14th-most of 194 cities and towns in Oregon. Osu Fairbanks South accounts for 1% of the charging ports in Corvallis. ChargePoint runs 18 stations in Corvallis. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.

Who operates Osu Fairbanks South?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 782 of those stations are in Oregon, 43% of the state's 1,823.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 24, 2015, one of 28 stations in Oregon with a 2015 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Osu Fairbanks South have?

Osu Fairbanks South has 1 charging port: 1 Level 2.

Does Osu Fairbanks South have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Osu Fairbanks South have?

Osu Fairbanks South has J1772 connectors.

Is Osu Fairbanks South open to the public?

Yes. Osu Fairbanks South is listed with public access, and its status is available.

Where is Osu Fairbanks South?

Osu Fairbanks South is at 220 SW 26th St, Corvallis, OR 97331. Its coordinates are 44.56488, -123.28056.

More EV charging around Corvallis

Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 71288, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Osu Fairbanks South, Corvallis, OR (AFDC station 71288)”, https://chargecensus.com/stations/oregon/osu-fairbanks-south-71288 (data as of October 12, 2026).