OSU - Parking Structure
AvailableEV charging station in Corvallis, Oregon on the Blink network — 6 Level 2. US DOE AFDC station 193268.
At a glance
OSU - Parking Structure is a public EV charging station at 1710 SW May Avenue in Corvallis, Oregon, on the Blink network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 1, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 193268 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 1, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Within ~15 km
Nearby charging
Blink · Available
- Charles Wilson Ford (DCFC)4 ports
Blink · Available
- West Oaks Left Pedestal2 ports
ChargePoint · Available
- Active9112 ports
Blink · Available
- Csd Lincoln Sta 12 ports
ChargePoint · Available
- Csd District Office2 ports
ChargePoint · Available
What kind of charging does OSU - Parking Structure offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.3 times the Oregon average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”.
How does OSU - Parking Structure compare with other stations in Corvallis?
Corvallis has 32 charging stations in the DOE registry with 69 ports, the 14th-most of 194 cities and towns in Oregon. OSU - Parking Structure accounts for 9% of the charging ports in Corvallis. Blink runs 9 stations in Corvallis. Statewide, Oregon has 1,823 stations and 4,794 ports, the 17th-largest station count of the 51 states and DC. The biggest station in Oregon, Sutherlin, OR - Tesla Supercharger in Sutherlin, has 51 ports.
Who operates OSU - Parking Structure?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 215 of those stations are in Oregon, 12% of the state's 1,823.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 1, 2020, one of 81 stations in Oregon with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does OSU - Parking Structure have?
OSU - Parking Structure has 6 charging ports: 6 Level 2.
Does OSU - Parking Structure have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does OSU - Parking Structure have?
OSU - Parking Structure has J1772 connectors.
Is charging at OSU - Parking Structure free?
Pricing as reported to the DOE registry: Free.
Is OSU - Parking Structure open to the public?
Yes. OSU - Parking Structure is listed with public access, and its status is available.
Where is OSU - Parking Structure?
OSU - Parking Structure is at 1710 SW May Avenue, Corvallis, OR 97331. Its coordinates are 44.56095, -123.27844.
More EV charging around Corvallis
Working with Oregon charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 193268, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “OSU - Parking Structure, Corvallis, OR (AFDC station 193268)”, https://chargecensus.com/stations/oregon/osu-parking-structure-193268 (data as of October 12, 2026).