ChargeCensus

ACE Energy - Statesville

Available

EV charging station in Statesville, North Carolina on the EV Connect network — 2 DC fast. US DOE AFDC station 405348.

At a glance

ACE Energy - Statesville is a public EV charging station at 122 Turnersburg Hwy in Statesville, North Carolina, on the EV Connect network. It has 2 charging ports (2 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jul 3, 2025.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID405348
NetworkEV Connect
StatusAvailable (E)
AccessPublic
Open dateJul 3, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EV Connect

Operates 1,601 stations in the DOE registry — view the full network →

Location

Address
122 Turnersburg Hwy
ZIP
28625
Coordinates
35.80904, -80.87551

Within ~15 km

Nearby charging

What kind of charging does ACE Energy - Statesville offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does ACE Energy - Statesville compare with other stations in Statesville?

Statesville has 13 charging stations in the DOE registry with 47 ports. ACE Energy - Statesville accounts for 4% of the charging ports in Statesville. EV Connect runs 2 stations in Statesville. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates ACE Energy - Statesville?

EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 74 of those stations are in North Carolina, 4% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 3, 2025, one of 328 stations in North Carolina with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does ACE Energy - Statesville have?

ACE Energy - Statesville has 2 charging ports: 2 DC fast.

Does ACE Energy - Statesville have DC fast charging?

Yes. The registry lists 2 DC fast ports at ACE Energy - Statesville, with CHAdeMO and CCS connectors.

What connectors does ACE Energy - Statesville have?

ACE Energy - Statesville has CHAdeMO and CCS connectors.

Is ACE Energy - Statesville open to the public?

Yes. ACE Energy - Statesville is listed with public access, and its status is available.

Where is ACE Energy - Statesville?

ACE Energy - Statesville is at 122 Turnersburg Hwy, Statesville, NC 28625. Its coordinates are 35.80904, -80.87551.

More EV charging around Statesville

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 405348, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “ACE Energy - Statesville, Statesville, NC (AFDC station 405348)”, https://chargecensus.com/stations/north-carolina/ace-energy-statesville-405348 (data as of October 12, 2026).