ChargeCensus

Flow Toyota Ct4k

Available

EV charging station in Statesville, North Carolina on the ChargePoint network — 2 Level 2. US DOE AFDC station 236399.

At a glance

Flow Toyota Ct4k is a public EV charging station at 997 Folger Dr in Statesville, North Carolina, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 22, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID236399
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 22, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
997 Folger Dr
ZIP
28625
Coordinates
35.78087, -80.86236

Within ~15 km

Nearby charging

What kind of charging does Flow Toyota Ct4k offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 37% below the North Carolina average of 3.2 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Flow Toyota Ct4k compare with other stations in Statesville?

Statesville has 13 charging stations in the DOE registry with 47 ports. Flow Toyota Ct4k accounts for 4% of the charging ports in Statesville. ChargePoint runs 5 stations in Statesville. Statewide, North Carolina has 2,050 stations and 6,462 ports, the 15th-largest station count of the 51 states and DC. The biggest station in North Carolina, Fort Bragg in Fayettville, has 138 ports.

Who operates Flow Toyota Ct4k?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,035 of those stations are in North Carolina, 50% of the state's 2,050.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 22, 2022, one of 201 stations in North Carolina with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Flow Toyota Ct4k have?

Flow Toyota Ct4k has 2 charging ports: 2 Level 2.

Does Flow Toyota Ct4k have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Flow Toyota Ct4k have?

Flow Toyota Ct4k has J1772 connectors.

Is Flow Toyota Ct4k open to the public?

Yes. Flow Toyota Ct4k is listed with public access, and its status is available.

Where is Flow Toyota Ct4k?

Flow Toyota Ct4k is at 997 Folger Dr, Statesville, NC 28625. Its coordinates are 35.78087, -80.86236.

More EV charging around Statesville

Working with North Carolina charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 236399, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Flow Toyota Ct4k, Statesville, NC (AFDC station 236399)”, https://chargecensus.com/stations/north-carolina/flow-toyota-ct4k-236399 (data as of October 12, 2026).