Break Time Miner Dc1
AvailableEV charging station in Sikeston, Missouri on the ChargePoint network — 1 DC fast. US DOE AFDC station 192907.
At a glance
Break Time Miner Dc1 is a public EV charging station at 2832 E Malone Ave in Sikeston, Missouri, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jul 16, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 192907 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 16, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Flying J 6714 ports
EVgo · Available
- Morlan Ford Ford Dc22 ports
ChargePoint · Available
- Sikeston Dt Dt Kingshiway2 ports
ChargePoint · Available
- Break Time Miner Bt L22 ports
ChargePoint · Available
What kind of charging does Break Time Miner Dc1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% below the Missouri average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Break Time Miner Dc1 compare with other stations in Sikeston?
Sikeston has 10 charging stations in the DOE registry with 23 ports, the 24th-most of 162 cities and towns in Missouri. Break Time Miner Dc1 accounts for 4% of the charging ports in Sikeston. ChargePoint runs 8 stations in Sikeston. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Break Time Miner Dc1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 16, 2021, one of 447 stations in Missouri with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Break Time Miner Dc1 have?
Break Time Miner Dc1 has 1 charging port: 1 DC fast.
Does Break Time Miner Dc1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Break Time Miner Dc1, with CHAdeMO and CCS connectors.
What connectors does Break Time Miner Dc1 have?
Break Time Miner Dc1 has CHAdeMO and CCS connectors.
Is Break Time Miner Dc1 open to the public?
Yes. Break Time Miner Dc1 is listed with public access, and its status is available.
Where is Break Time Miner Dc1?
Break Time Miner Dc1 is at 2832 E Malone Ave, Sikeston, MO 63801. Its coordinates are 36.89361, -89.52881.
More EV charging around Sikeston
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 192907, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Break Time Miner Dc1, Sikeston, MO (AFDC station 192907)”, https://chargecensus.com/stations/missouri/break-time-miner-dc1-192907 (data as of October 12, 2026).