ChargeCensus

Break Time Miner Bt L2

Available

EV charging station in Sikeston, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 192908.

At a glance

Break Time Miner Bt L2 is a public EV charging station at 2832 E Malone Ave in Sikeston, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 16, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID192908
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJul 16, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2832 E Malone Ave
ZIP
63801
Coordinates
36.89366, -89.52886

Within ~15 km

Nearby charging

What kind of charging does Break Time Miner Bt L2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Break Time Miner Bt L2 compare with other stations in Sikeston?

Sikeston has 10 charging stations in the DOE registry with 23 ports, the 24th-most of 162 cities and towns in Missouri. Break Time Miner Bt L2 accounts for 9% of the charging ports in Sikeston. ChargePoint runs 8 stations in Sikeston. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.

Who operates Break Time Miner Bt L2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 16, 2021, one of 447 stations in Missouri with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Break Time Miner Bt L2 have?

Break Time Miner Bt L2 has 2 charging ports: 2 Level 2.

Does Break Time Miner Bt L2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Break Time Miner Bt L2 have?

Break Time Miner Bt L2 has J1772 connectors.

Is Break Time Miner Bt L2 open to the public?

Yes. Break Time Miner Bt L2 is listed with public access, and its status is available.

Where is Break Time Miner Bt L2?

Break Time Miner Bt L2 is at 2832 E Malone Ave, Sikeston, MO 63801. Its coordinates are 36.89366, -89.52886.

More EV charging around Sikeston

Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 192908, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Break Time Miner Bt L2, Sikeston, MO (AFDC station 192908)”, https://chargecensus.com/stations/missouri/break-time-miner-bt-l2-192908 (data as of October 12, 2026).