ChargeCensus

Windemuller Wayland #1

Available

EV charging station in Wayland, Michigan on the ChargePoint network — 1 DC fast. US DOE AFDC station 440775.

At a glance

Windemuller Wayland #1 is a public EV charging station at 1176 Electric Ave in Wayland, Michigan, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Nov 8, 2025.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID440775
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateNov 8, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1176 Electric Ave
City
Wayland
ZIP
49348
Coordinates
42.76606, -85.66105

Within ~15 km

Nearby charging

What kind of charging does Windemuller Wayland #1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Michigan average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Windemuller Wayland #1 compare with other stations in Wayland?

Wayland has 9 charging stations in the DOE registry with 26 ports. Windemuller Wayland #1 accounts for 4% of the charging ports in Wayland. ChargePoint runs 4 stations in Wayland. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Windemuller Wayland #1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 8, 2025, one of 417 stations in Michigan with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Windemuller Wayland #1 have?

Windemuller Wayland #1 has 1 charging port: 1 DC fast.

Does Windemuller Wayland #1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Windemuller Wayland #1, with CHAdeMO and CCS connectors.

What connectors does Windemuller Wayland #1 have?

Windemuller Wayland #1 has CHAdeMO and CCS connectors.

Is Windemuller Wayland #1 open to the public?

Yes. Windemuller Wayland #1 is listed with public access, and its status is available.

Where is Windemuller Wayland #1?

Windemuller Wayland #1 is at 1176 Electric Ave, Wayland, MI 49348. Its coordinates are 42.76606, -85.66105.

More EV charging around Wayland

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 440775, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Windemuller Wayland #1, Wayland, MI (AFDC station 440775)”, https://chargecensus.com/stations/michigan/windemuller-wayland-1-440775 (data as of October 12, 2026).