Metro Health Employee Parking Lot
AvailableEV charging station in Wyoming, Michigan, not on a charging network — 6 Level 2. US DOE AFDC station 214685.
At a glance
Metro Health Employee Parking Lot is a public EV charging station at 5869 Metro Way in Wyoming, Michigan, not attached to a charging network. It has 6 charging ports (6 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 20, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 214685 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Hospital |
| Open date | Apr 20, 2022 |
| Last updated at source | Jul 15, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5869 Metro Way
- City
- Wyoming
- State
- Michigan
- ZIP
- 49519
- Coordinates
- 42.85782, -85.71528
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- U of M Health Wyoming MI12 ports
Red E · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Meijer 254 (Hudsonville, MI)6 ports
Electrify America · Available
- Staybridge Suites6 ports
Non-networked · Available
What kind of charging does Metro Health Employee Parking Lot offer?
Of its 6 ports, 6 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a hospital location. It is flagged as workplace charging.
How does Metro Health Employee Parking Lot compare with other stations in Wyoming?
Wyoming has 4 charging stations in the DOE registry with 21 ports. Metro Health Employee Parking Lot accounts for 29% of the charging ports in Wyoming. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Metro Health Employee Parking Lot?
Metro Health Employee Parking Lot is listed as non-networked: its chargers are not run through a charging-network account. Michigan has 331 non-networked stations, 15% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 20, 2022, one of 351 stations in Michigan with a 2022 open date. The station's record was last updated at the source on Jul 15, 2026.
Frequently asked questions
How many chargers does Metro Health Employee Parking Lot have?
Metro Health Employee Parking Lot has 6 charging ports: 6 Level 2.
Does Metro Health Employee Parking Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 6 ports are all Level 2.
What connectors does Metro Health Employee Parking Lot have?
Metro Health Employee Parking Lot has J1772 connectors.
Is Metro Health Employee Parking Lot open to the public?
Yes. Metro Health Employee Parking Lot is listed with public access, and its status is available.
Where is Metro Health Employee Parking Lot?
Metro Health Employee Parking Lot is at 5869 Metro Way, Wyoming, MI 49519. Its coordinates are 42.85782, -85.71528.
More EV charging around Wyoming
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 214685, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Metro Health Employee Parking Lot, Wyoming, MI (AFDC station 214685)”, https://chargecensus.com/stations/michigan/metro-health-employee-parking-lot-214685 (data as of October 12, 2026).