ChargeCensus

Washtenaw N 4th Ave

Available

EV charging station in Ann Arbor, Michigan on the Red E network — 2 Level 2. US DOE AFDC station 351686.

At a glance

Washtenaw N 4th Ave is a public EV charging station at 219 N 4th Ave in Ann Arbor, Michigan, on the Red E network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 1, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID351686
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateMay 1, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
219 N 4th Ave
ZIP
48104
Coordinates
42.28301, -83.74774

Within ~15 km

Nearby charging

What kind of charging does Washtenaw N 4th Ave offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Washtenaw N 4th Ave compare with other stations in Ann Arbor?

Ann Arbor has 148 charging stations in the DOE registry with 350 ports, the 2nd-most of 355 cities and towns in Michigan. Washtenaw N 4th Ave accounts for under 1% of the charging ports in Ann Arbor. Red E runs 6 stations in Ann Arbor. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Washtenaw N 4th Ave?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 442 of those stations are in Michigan, 20% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 1, 2024, one of 397 stations in Michigan with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Washtenaw N 4th Ave have?

Washtenaw N 4th Ave has 2 charging ports: 2 Level 2.

Does Washtenaw N 4th Ave have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Washtenaw N 4th Ave have?

Washtenaw N 4th Ave has J1772 connectors.

Is Washtenaw N 4th Ave open to the public?

Yes. Washtenaw N 4th Ave is listed with public access, and its status is available.

Where is Washtenaw N 4th Ave?

Washtenaw N 4th Ave is at 219 N 4th Ave, Ann Arbor, MI 48104. Its coordinates are 42.28301, -83.74774.

More EV charging around Ann Arbor

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 351686, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Washtenaw N 4th Ave, Ann Arbor, MI (AFDC station 351686)”, https://chargecensus.com/stations/michigan/washtenaw-n-4th-ave-351686 (data as of October 12, 2026).