ChargeCensus

Brightdawn Village

Available

EV charging station in Ann Arbor, Michigan on the Red E network — 13 Level 2. US DOE AFDC station 463296.

At a glance

Brightdawn Village is a public EV charging station at 2805 Burton, Rd in Ann Arbor, Michigan, on the Red E network. It has 13 charging ports (13 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 6, 2026.

Total ports
13
DC fast
0
Level 2
13
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID463296
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateMay 6, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
2805 Burton, Rd
ZIP
48104
Coordinates
42.24905, -83.68478

Within ~15 km

Nearby charging

What kind of charging does Brightdawn Village offer?

Of its 13 ports, 13 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 4.6 times the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Brightdawn Village compare with other stations in Ann Arbor?

Ann Arbor has 148 charging stations in the DOE registry with 350 ports, the 2nd-most of 355 cities and towns in Michigan. Brightdawn Village accounts for 4% of the charging ports in Ann Arbor. Red E runs 6 stations in Ann Arbor. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Brightdawn Village?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 442 of those stations are in Michigan, 20% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 6, 2026, one of 234 stations in Michigan with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Brightdawn Village have?

Brightdawn Village has 13 charging ports: 13 Level 2.

Does Brightdawn Village have DC fast charging?

No. The registry lists no DC fast ports here; its 13 ports are all Level 2.

What connectors does Brightdawn Village have?

Brightdawn Village has J1772 connectors.

Is Brightdawn Village open to the public?

Yes. Brightdawn Village is listed with public access, and its status is available.

Where is Brightdawn Village?

Brightdawn Village is at 2805 Burton, Rd, Ann Arbor, MI 48104. Its coordinates are 42.24905, -83.68478.

More EV charging around Ann Arbor

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 463296, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Brightdawn Village, Ann Arbor, MI (AFDC station 463296)”, https://chargecensus.com/stations/michigan/brightdawn-village-463296 (data as of October 12, 2026).