ChargeCensus

Aahc Station 2

Available

EV charging station in Ann Arbor, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 456294.

At a glance

Aahc Station 2 is a public EV charging station at 121 Catherine St in Ann Arbor, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 24, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID456294
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 24, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
121 Catherine St
ZIP
48104
Coordinates
42.28352, -83.74729

Within ~15 km

Nearby charging

What kind of charging does Aahc Station 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Aahc Station 2 compare with other stations in Ann Arbor?

Ann Arbor has 148 charging stations in the DOE registry with 350 ports, the 2nd-most of 355 cities and towns in Michigan. Aahc Station 2 accounts for under 1% of the charging ports in Ann Arbor. ChargePoint runs 115 stations in Ann Arbor. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Aahc Station 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 24, 2026, one of 234 stations in Michigan with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Aahc Station 2 have?

Aahc Station 2 has 2 charging ports: 2 Level 2.

Does Aahc Station 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Aahc Station 2 have?

Aahc Station 2 has J1772 connectors.

Is Aahc Station 2 open to the public?

Yes. Aahc Station 2 is listed with public access, and its status is available.

Where is Aahc Station 2?

Aahc Station 2 is at 121 Catherine St, Ann Arbor, MI 48104. Its coordinates are 42.28352, -83.74729.

More EV charging around Ann Arbor

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 456294, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Aahc Station 2, Ann Arbor, MI (AFDC station 456294)”, https://chargecensus.com/stations/michigan/aahc-station-2-456294 (data as of October 12, 2026).