Naed Naed 1
AvailableEV charging station in North Attleborough, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 182810.
At a glance
Naed Naed 1 is a public EV charging station at 275 Landry Ave in North Attleborough, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 182810 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 275 Landry Ave
- State
- Massachusetts
- ZIP
- 02760
- Coordinates
- 41.98953, -71.29960
Within ~15 km
Nearby charging
- Attleboro High School16 ports
Non-networked · Available
- Wheaton Lot 1 - College Green14 ports
AmpUp · Available
- Wheaton College Lot 2 - Elm St14 ports
AmpUp · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- 45 Washington St12 ports
EV Connect · Available
What kind of charging does Naed Naed 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Naed Naed 1 compare with other stations in North Attleborough?
North Attleborough has 12 charging stations in the DOE registry with 28 ports. Naed Naed 1 accounts for 7% of the charging ports in North Attleborough. ChargePoint runs 8 stations in North Attleborough. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Naed Naed 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Naed Naed 1 have?
Naed Naed 1 has 2 charging ports: 2 Level 2.
Does Naed Naed 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Naed Naed 1 have?
Naed Naed 1 has J1772 connectors.
Is Naed Naed 1 open to the public?
Yes. Naed Naed 1 is listed with public access, and its status is available.
Where is Naed Naed 1?
Naed Naed 1 is at 275 Landry Ave, North Attleborough, MA 02760. Its coordinates are 41.98953, -71.29960.
More EV charging around North Attleborough
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 182810, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Naed Naed 1, North Attleborough, MA (AFDC station 182810)”, https://chargecensus.com/stations/massachusetts/naed-naed-1-182810 (data as of October 12, 2026).