Wheaton Lot 1 - College Green

Available

EV charging station in Norton, Massachusetts on the AmpUp network — 14 Level 2. US DOE AFDC station 230423.

At a glance

Wheaton Lot 1 - College Green is a public EV charging station at 26 E Main St in Norton, Massachusetts, on the AmpUp network. It has 14 charging ports (14 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 15, 2022.

Total ports
14
DC fast
0
Level 2
14
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID230423
NetworkAmpUp
StatusAvailable (E)
AccessPublic
FacilityCollege campus
Open dateSep 15, 2022
Last updated at sourceOct 8, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: $0.33 per kWh

Charging network

AmpUp

Operates 1,322 stations in the DOE registry — view the full network →

Location

Address
26 E Main St
City
Norton
ZIP
02766
Coordinates
41.96811, -71.18677

Within ~15 km

Nearby charging

What kind of charging does Wheaton Lot 1 - College Green offer?

Of its 14 ports, 14 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 5.3 times the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “$0.33 per kWh”. The site is listed as a college campus location.

How does Wheaton Lot 1 - College Green compare with other stations in Norton?

Norton has 13 charging stations in the DOE registry with 59 ports. Wheaton Lot 1 - College Green accounts for 24% of the charging ports in Norton. AmpUp runs 3 stations in Norton. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Wheaton Lot 1 - College Green?

AmpUp operates 1,322 stations in the registry across 47 states, with 18 DC fast and 5,339 Level 2 ports in total. 198 of those stations are in Massachusetts, 4% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 15, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Oct 8, 2026.

Frequently asked questions

How many chargers does Wheaton Lot 1 - College Green have?

Wheaton Lot 1 - College Green has 14 charging ports: 14 Level 2.

Does Wheaton Lot 1 - College Green have DC fast charging?

No. The registry lists no DC fast ports here; its 14 ports are all Level 2.

What connectors does Wheaton Lot 1 - College Green have?

Wheaton Lot 1 - College Green has J1772 connectors.

Is charging at Wheaton Lot 1 - College Green free?

Pricing as reported to the DOE registry: $0.33 per kWh.

Is Wheaton Lot 1 - College Green open to the public?

Yes. Wheaton Lot 1 - College Green is listed with public access, and its status is available.

Where is Wheaton Lot 1 - College Green?

Wheaton Lot 1 - College Green is at 26 E Main St, Norton, MA 02766. Its coordinates are 41.96811, -71.18677.

More EV charging around Norton

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 230423, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wheaton Lot 1 - College Green, Norton, MA (AFDC station 230423)”, https://chargecensus.com/stations/massachusetts/wheaton-lot-1-college-green-230423 (data as of October 12, 2026).